法规更新

Malaysia:SIRIM/ST Surveillance requirements updates

2023-06-20

Be informed that SIRIM / ST had try to follow back to the original SIRIM Agreement to conduct two (2) surveillance inspections  for each annual renewal period.

This had just implemented, so all of the renewal starting this year will need to conduct  2 surveillance inspection .

 

Below are the details of the 2 surveillance.

   

     1st surveillance inspection.

    

1.surveillance inspection at factory/manufacturer (on-site) OR

2.surveillance inspection at factory/manufacturer (remote) OR

3.surveillance Local warehouse inspection:

                     ·         Sampling certified models (a few qty) to check ST-SIRIM labels on products.

·         Sampling one-unit certified model for verification purpose (product sample against test report). Verification will be conducted at the warehouse/ applicant       premises/ *SIRIM office.

·         To check records of usage of ST-SIRIM labels.

·         To check inbound and outbound records for certified model(s).

·         To check warehouse SOP

·         If label is stick in warehouse , the process of sticking label will be audited.

Note: * subject to acceptance by SIRIM project officer and size of product.

           2nd surveillance inspection (for renewal license) 

           surveillance inspections at factory/manufacturer (on-site) 

 

For full support with your global market access requirements or regulatory intelligence needs please contact us at 

GMA@vscbcorp.com.

 


Loading...